Keep electrical systems in step with other building decisions

We support the installation of power and low-current systems together with architectural, mechanical, fire, security, automation and interior decisions on site.

WHEN IS THIS SERVICE APPROPRIATE?

The same route is claimed by more than one trade

Ceiling, wall or shaft details are being finalised

Equipment positions are about to be fixed on site

A revision in one discipline has not reached the others

The interface between contractors is not clearly defined

Site changes are being made without a common record

SERVICE SCOPE

Where clashes usually appear

Electrical and architectural

Ceilings, walls, furniture layouts and finishes are gone through against luminaire, socket, panel and route positions.

Electrical and mechanical

Duct, pipe and tray routes, shafts and plant room crossings are checked so that clearances and access remain workable.

Power and low current

Cable routes, cabinet locations and device positions are coordinated so that power and low-current works do not obstruct each other during installation.

Equipment and infrastructure

Connection points, foundations, entries and outdoor routes are matched with the equipment actually delivered to site.

Contractor and supplier

Who installs, who connects and who tests at each interface is written down before the boundary becomes a dispute on site.

Project and site

Differences between the drawing and what is actually built are recorded, and the affected disciplines are informed of the change.

IN SCOPE

The work is carried out on the project documents, site information and correspondence available for the agreed scope. Information that is missing or cannot be verified is recorded as an open item and reported with the responsible party, rather than assumed.

Electrical and architectural

Electrical and mechanical

Power and low current

Equipment and infrastructure

Contractor and supplier

Project and site

What we need to start

If some drawings or interface definitions are not yet available, work can still start; the gaps are recorded as open items and followed with the responsible party.

  • Current architectural, mechanical and electrical drawings
  • Ceiling, shaft and plant room layouts
  • Equipment list and dimensions of delivered equipment
  • Revision status of each discipline
  • Site photographs of the areas in question
  • The contractor and supplier scope split, where it is defined

What you receive

  • Coordination and clash list
  • Marked-up project drawings
  • Interface and responsibility table
  • Coordination meeting actions
  • Decision and closure records
FROM THE FIELD

An example before the ceiling closes

On a hotel floor, the lighting layout, the sprinkler heads and the ventilation grilles all land in the same ceiling zone, and the suspended ceiling is due to be closed the following week. The affected areas are gone through on the drawings and on site, the clash points are listed with the discipline responsible for each, and the agreed positions are marked up. The revision is passed on to the other disciplines before the ceiling is closed, rather than after it is opened again.

SCOPE LIMIT

Coordination is carried out on the drawings, site information and correspondence available for the agreed scope. The design of the systems themselves, the evaluation of suppliers or equipment, and the cost management of other disciplines remain outside this service; each contractor keeps its own responsibility for the works it carries out.

See clashes before they reach the site

Share your architectural and technical drawings. Let’s identify the critical coordination points together.

Prefer to write instead?Message us on WhatsApp