Peritus Electric
Budget & Procurement Advisory

What is a realistic budget for the project?

Taking into account the project’s scope, the current level of design and known market conditions, we prepare a cost estimate that gives your budget decisions a solid basis. The estimate range and level of uncertainty are set at the start of the work according to how complete the available project information is, rather than promised as a fixed figure.

WHEN IS THIS SERVICE APPROPRIATE?

When setting an early budget before design is complete

When deciding whether a project fits the funds available

Before approaching contractors, to have a reference figure

When comparing design options that carry different costs

When a stakeholder or lender asks for a cost basis

When you suspect the current budget may be unrealistic

SERVICE SCOPE

What the estimate covers

Depending on the scope of work, the review is carried out on the available project documents, quantity lists, bids and equipment information; missing or unverifiable information is recorded as an open item.

Early-stage budget work

Design-based cost estimation

Material, equipment and installation costs

Power and low-current packages

Logistics and delivery conditions

Price date and currency basis

Uncertainty and risk allowance

Alternative budget scenarios

What we need to start

You do not need a finished design to start; we work with the level you have and record any gaps as open items that can be firmed up later.

  • The current design or drawings, at whatever stage they are
  • A description of the intended scope and quality level
  • Any quantity list already prepared, if one exists
  • Known constraints on timing, delivery or currency
  • The purpose of the estimate (early budget, comparison, approval)

What you receive

  • A cost table broken down by main items
  • The assumptions the estimate is built on
  • A clear note of what is out of scope
  • A budget range with its level of uncertainty
  • Any alternative scenarios considered
FROM THE FIELD

From the field

An office fit-out was being planned around a budget set from a rough per-square-metre figure. Working from the concept drawings, we prepared an estimate covering the power and low-current packages, the switchgear and the delivery conditions for imported equipment. The result sat noticeably above the original figure, and by showing the assumptions behind it we let the client adjust either the budget or the scope before going out to bid.

SCOPE LIMIT

This is an electrical cost estimate to support budgeting, not an official valuation or a guaranteed final price, and it does not cover other construction disciplines or tax and customs matters.

Give your budget a solid basis

Tell us where the design stands and what the budget is for, and we will build an estimate around it, assumptions and all.

Prefer to write instead?Message us on WhatsApp